5 comments

  • andruschakartem 1 hour ago
    23 months to build is impressive, but the number that matters for EGS is thermal drawdown. If the fractured rock cools faster than modeled they have to keep drilling new wells, so I'd like to see Cape's output a few years in.
    • ceejayoz 1 hour ago
      Is there any reason to believe this is likely?
      • floatrock 55 minutes ago
        If it wasn't, enhanced geothermal would be everywhere, which it isn't. (Yet, this company would say.)

        Op is really just describing a core breakeven metric on the energy source. In the same way you measure an oil well with half-life of useful output, this is basically saying "EGS can prove to be useful if they can make sure they extract more economically useful heat than the economic costs of constantly drilling new wells."

        Since no one has really made EGS widespread yet, that suggests no one has yet cracked this nut.

        • ceejayoz 39 minutes ago
          > If it wasn't, enhanced geothermal would be everywhere, which it isn't.

          That seems like a fallacy.

      • olau 22 minutes ago
        It is not an uncommon problem with geothermal.
  • LikeBeans 1 hour ago
    I admit I don't know enough, but does it negatively affect the underground water a negative way? I read a while back that geothermal plants (can) use fracking like technique to heat up the water but it has negative effects on the local geology and underground water. But not sure if that's true hencey question here.
    • tonyarkles 29 minutes ago
      Huh, my first reaction was to say that Enhanced Geothermal is actually just a polite way of saying fracked geothermal but it turns out that's not quite accurate. Hydro-shearing (which EGS uses) doesn't intentionally create new cracks in the rock, which fracking does, but will cause existing cracks to grow. Potentially still negative local effects for sure but not as violently, hopefully.
  • thinkcontext 1 hour ago
    Certainly a welcome development. Let's hope this pilot can be repeated and scaled.
  • pfdietz 3 hours ago
    If the coffin needed any more nails, this puts the final kibosh on that cancelled SMR project out there that centered on Utah and Idaho, the one involving NuScale. Geothermal makes much more sense for them now.

    There's a geothermal project at the Newberry Volcano in Oregon that also looks interesting (different people doing that).

    • billjive 1 hour ago
      Yes! It's near where I live, very excited to see this come online.
    • toomuchtodo 1 hour ago
      Does this support improved availability and economics of district heating?
      • pfdietz 56 minutes ago
        I don't think district heating had anything to do with the CFPP.
        • toomuchtodo 44 minutes ago
          I was referring to enhanced geothermal in general for district heating, as I believe you are potentially a subject matter expert and qualified to opine.
    • IG_Semmelweiss 1 hour ago
      [flagged]
  • haroldopina 46 minutes ago
    [flagged]